IN THE MARKET? – CLICK BELOW FOR OPEN HOMES THIS SATURDAY
Construction is now well underway on the $19.5 million Suttons Beach Pavilion, and with bulldozers on site and a 2027 opening date locked in, Redcliffe locals are finally getting a clearer picture of what to expect when the dust settles.
Read: Sod Turned on Redevelopment of Suttons Beach Pavilion
A Building That Earns Its Spot on the Bay

The centrepiece of the development is a striking two-storey coastal structure designed to make the most of its prime beachfront position. The design was selected through a national competition endorsed by the Australian Institute of Architects, and takes cues from the curved forms of the original art deco pavilion that once stood on the site. Think open decks, breezy walkways, a sleek foreshore profile, and a rooftop platform with views stretching across Moreton Bay.
One of the more distinctive design elements is the “reverse rotunda,” an open central space conceived for meeting, hanging out, and enjoying unobstructed water views.
The 1998 rotunda will be relocated to provide shaded seating rather than being removed from the site entirely. Even the bricks from the old demolished pavilion will be reused in the landscaping, a deliberate link to what came before.
Dining Is Back on the Foreshore

One of the most anticipated elements of the new build is the return of ocean-facing dining to the foreshore. The new pavilion will include multiple indoor and outdoor food and beverage tenancies, with the dynamic mix to be determined through a separate tender process. In practice, that means a range of dining and drinking options, from casual fish and chips overlooking the sand to fresh Moreton Bay seafood and more upmarket offerings.
The return of ocean-facing dining is one of the project’s most anticipated outcomes.
More Than Just a Restaurant Precinct
The pavilion is about more than just somewhere to eat and drink. The broader development includes extensive landscaping designed to connect the building with the surrounding parkland, new public changing rooms and showers for beachgoers, and expanded shade structures. Shaded colonnades will link the precinct to the park, and landscaped spaces are planned with markets and community events in mind.
The adjacent car park is also in line for upgrades, and accessible public amenities are included in the scope, infrastructure designed to support both everyday beachgoers and larger community events.
A New Era for Suttons Beach

Moreton Bay Mayor Peter Flannery said it was exciting to see work under way. “It’s fantastic that construction has begun on this highly anticipated project that will return the site to an iconic destination the community can enjoy for generations to come,” he said. “With a vibrant hospitality scene and stunning beachfront location, the new Suttons Beach Pavilion will be a popular destination for locals and visitors alike.”
Read: Multimillion-Dollar Transformation Secured for Suttons Beach Foreshore
Beachfront developments of this scale are rare, and the project has been deliberately designed to make the most of the site’s natural advantages. The project is backed by funding from all three levels of authority, council, state and federal, reflecting the development’s significance as a long-term investment in the region.
With a 2027 opening on the horizon, for a community that has long waited for this stretch of foreshore to be restored, construction starting is the clearest sign yet that the wait is nearly over.
Published 4-March-2026
CLICK ANY LOGO TO SEE PUBLICATION


















